Test the building and sign-zone feasibility
Feasibility starts with the building, the proposed sign zone and the way the sign will be seen. Available drawings and a site survey can establish mounting surfaces, structural zones, viewing distance, access, exposure, landlord constraints and whether the concept can be divided into modules that can be fabricated, transported and lifted. Resolving those inputs before detailed artwork gives design, engineering and installation one workable basis.
Start a project 


